| Forms |
- If several fragnet steps with different trades are selected, the start date and end date can be changed
- Multiple companies at the trade is been fixed
|
| PDF Export |
- The text about material on job cards is not cropped
- Multiple milestones with linked fragnet steps in PDF have been fixed
- The text on the job cards is wrapped
|
| View |
- The names of collapsed takt zones in the PP are shown correctly
|
| Mobile App |
- Optimized workflows for project roles
- Todays date is correctly respected in the filter
- Fragnet steps with duration of one day are respected in the date filter
|