Usability |
- As a user, you now have the option of leave your project without having to open it. This means you can easily remove projects from the project list.

- At the end of each week, a thicker line is now inserted in the process plan to improve the overview between the week changes.
- The area attachments that were previously loaded in a new tab can now be downloaded immediately with the correct file name or enlarged in the view.

|