| Process plan |
- Project start is set to 1970 after copying projects or areas
|
| Stability Criteria |
- Visual adjustments to the list of trades when creating stability criteria
Search bar active Value in the slider after opening the stability criteria in sidebar always set to "on time"
|
| Ressource chart |
- When switching to "work force" or switching the dynamic scaling, values of processes are shown
|
| Bluescreen |
- when using the search bar in trade list
- when moving processes outside the process plan (to the margin)
- when changing the trade color
|